Technical Knowledge
News, activities and updates from BILOCO.

VRV/VRF and AHU/FCU: Matching the Approach to Project Requirements
VRV/VRF and AHU/FCU serve different air-conditioning arrangements and cannot be treated as direct substitutes in every building. Selection depends on thermal loads, fresh-air needs, controls and operating conditions.
Read article →
Coordinating HVAC With Electrical, Fire Protection and Architecture
HVAC cannot be coordinated separately from power, plumbing, fire protection and architecture. Equipment, duct routes, condensate drains and maintenance openings all occupy shared technical space.
Read article →
Grounding and Lightning Protection: Inputs to Confirm Before Installation
Earthing and lightning protection should be coordinated with the overall electrical design. Bonding points, earth-network layout, down-conductor routes and inspection requirements are best resolved before finishes conceal the.
Read article →