Fire Protection Systems
News, activities and updates from BILOCO.

Fire Protection Maintenance: Records to Keep After Each Inspection
Fire-system maintenance records should identify what was checked, test conditions and any outstanding defects. A simple completed tick box cannot replace equipment history and corrective-action evidence.
Read article →
Fire Pump Room: Installation and Pre-Commissioning Checklist
A fire-pump room requires careful coordination of mechanical equipment, piping, electrical supplies and monitoring signals. Service clearances, valves, gauges and test provisions should be reviewed during layout planning.
Read article →
Sprinkler and Hydrant Piping: Coordinating Routes With Other Trades
Sprinkler and hydrant lines traverse spaces with different clearance conditions. Pipe routing must protect the fire-engineering intent while avoiding clashes with ducts, cable trays and structure.
Read article →
Fire Protection Systems: Scope to Clarify Before Construction
Fire-protection delivery spans design, supply, installation, testing, system integration and statutory acceptance. Owners should define responsibility boundaries and documentation requirements at the outset.
Read article →